CHP plant with gas engines for city DH system
The generated thermal power is delivered into district heating system. The generated electrical power through the step-up transformer 0,4/10 kV is fed into public electrical power grid. Each of the engines is installed separate engine room. Other equipment at the site: flue gas heat exchangers, silencers, pumps and other auxiliary equipment are installed in the 2nd floor of the building.