Horizontal steam boiler of 3.2 t/h, eff. 96-97 %.
Water deaeration module, feed water pumps module, control system.
Water treatment equipment.

Project execution: 2016 – 2017.

Scope of supply

  • Design works
  • Steam boiler
  • Water deaeration module with blow down vessel
  • Water softener
  • RO (reverse osmosis)
  • Electrification and automation of process
  • Installation
  • Commissioning
  • Service